sub-top-left
sub-top-rigth
Engineering
Design, Bulid, Test and Learn.
engi-top
Figure 1. Wet Lab DBTL cycles for V-CHARGEs development.
The engineering of V-CHARGEs followed five iterative DBTL cycles: protein expression and purification, P22-VLP self-assembly optimization, enzyme stability testing, enzyme coupling, and product detection. These steps together established a robust and modular ATP regeneration platform.
Entreprenurship
Next
sub-main-left
sub-main-rigth